Culvert Repair, 2018
Banff National Park, Alberta
Johnston Canyon Rock Stabilization, Banff National Park, Alberta, 2016. Replacement of 1600m of handrail along the Johnston's Canyon Trail, as well as rock scaling, trimming, rock boltin, rockfall mesh install, asphalt repair, designated tree removal, and stone retaining wall construction.
Kimberley, British Columbia, 2017. Installation of a 6m wide shallow landslide barrier (SLB) on a steep slope above the Overwaitea grocery store.
Mt. Revelstoke National Park, British Columbia, 2016. Construction of a 400m2 MSE retaining wall and reconstruction of Trans-Canada Highway.
Alberta Transportation, Kananaskis and Crowsnest, Alberta, 2016. Installation of 16,000m2 total of rockfall slope mesh at 3 separate sites, 210m of extruded concrete barrier, and 165m of high tension cable barrier. This included the construction of a 35m x 5m GRS wall, only the second of its kind in Canada at that time.
Design and build precast concrete box culvert, 2018
Culvert Cleanouts, 2018
Design and build reinforced retaining wall, 2018
Culvert Repair, 2018
Banff National Park, Alberta
Johnston Canyon Rock Stabilization, Banff National Park, Alberta, 2016. Replacement of 1600m of handrail along the Johnston's Canyon Trail, as well as rock scaling, trimming, rock boltin, rockfall mesh install, asphalt repair, designated tree removal, and stone retaining wall construction.
Kimberley, British Columbia, 2017. Installation of a 6m wide shallow landslide barrier (SLB) on a steep slope above the Overwaitea grocery store.
Mt. Revelstoke National Park, British Columbia, 2016. Construction of a 400m2 MSE retaining wall and reconstruction of Trans-Canada Highway.